Project Brupegvideo

Something special happened in the engine room - Project Brupeg Ep.308

18 June 2023 · 34 min · 41K views

What this video covers

The crew of the 17.37-meter steel vessel Brupeg performs multiple refit tasks, including engine room bulkhead preparation, electrical system upgrades, and the installation of a new induction cooktop.0:09 Damien and the team grind and fair the engine room bulkhead to prepare for a commemorative laser-etched stainless steel plaque dedicated to a supporter, Billy McConnell.3:53 To accommodate the new induction cooktop, Damien modifies the galley cabinetry and polishes the stainless steel surface to a brushed finish.8:59 Meanwhile, guest Philip Duncan installs current-monitoring hardware for the boat’s two inverters, using current clips and a Raspberry Pi Pico board to display power output on the bridge.5:31 Margot installs insulation in the lower cabin, following the original 50-year-old design that maintains a one-inch air gap between the hull and insulation to prevent condensation on the steel.23:03 Damien also prepares to mount a SeaTalk digital compass on the radar mast, positioning it away from the steel structure to ensure accurate navigation data.23:24

Watch on YouTube

More from Project Brupeg

Was the outboard rebuild worth it and Brupeg has developed a worrying noise... Project Brupeg Ep.456Aug 2026Three Builds, One Croc Sanctuary: Boat Life on Brupeg - Project Brupeg Ep.455Aug 2026Brupeg's 1st Drone, Green Island & Boatwork - Project Brupeg Ep.454Jul 2026Good Mates & Boat Maintenance - Project Brupeg Ep.453Jul 2026

From Project Brupeg — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue