Project Brupegvideo

Making the stabiliser sliders work - Project Brupeg Ep. 154

25 giugno 2020 · 29 min · 37K visualizzazioni

Cosa tratta questo video

The conversion of a former fishing trawler into an expedition vessel requires the fabrication and alignment of custom stabilizer wing sliders. To determine the geometry for the stabilizer arms, the crew mounts two M30 studs to the deck and uses a 38mm stainless steel pipe as a temporary test pin to simulate the pivot point.9:02 Because the stabilizer wings are not square, the team must recess the sliders into the vessel's roof structure, necessitating a 50mm to 100mm trim of the roofline to ensure a snug fit.14:59 The current manual winching setup prevents the wings from retracting fully against the hull, so the crew plans to replace these with 24-volt electric winches mounted on the wheelhouse.28:38 Additional work includes sealing internal wooden walls with epoxy to prevent rot from condensation and preparing a 120-pound Danforth anchor for use as a stern anchor.27:43 The project remains in the fabrication phase, with the team focusing on aligning the arm geometry before finalizing the permanent mounting plates.

Guarda su YouTube

Altro da Project Brupeg

What caused the steering to fail - Project Brupeg Ep.463ott 2026CHAOS! & our first Night Time Trailer Haul Out - Project Brupeg Ep.462set 2026Look, It's possible we should have cleaned this before now... Project Brupeg Ep.461set 2026The Ridiculously Powerful Davit Winch - Project Brupeg Ep.460set 2026

Da Project Brupeg — guarda la barca, l'equipaggio e ogni video analizzato del canale.

The Sailing Directory Newsletter

Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.

Segnala un problema