RAN Sailingvideo
Keel Recess Work Begins! Building Our 50ft Dreamboat - Ep. 369
27 ottobre 2023 · 19 min · 117K visualizzazioni · Skåne
Cosa tratta questo video
To prepare for laminating the hull of a 50-foot boat, the crew constructed a climate-controlled enclosure within a barn using plastic sheeting to create an insulated air gap.1:30 They installed two 9-kilowatt electrical heaters and a diesel heater to maintain stable temperatures, monitoring conditions with sensors for humidity, temperature, and barometric pressure.3:12 To prevent moisture from the ground, they covered the floor with plastic.3:36 The team prepared the keel recess by cutting five layers of 600-gram fiberglass cloth, each with rounded corners to improve structural integrity.14:10 They also cut vacuum-bagging materials and added unidirectional 1200-gram fiberglass reinforcement for the chain plate areas.11:21 Before the main lamination, they applied a primer coat of epoxy to the wood to prevent off-gassing and ensure the wood does not wick resin away from the fiberglass, which could result in a starved joint.14:54 The crew plans to apply the fiberglass in smaller sections to manage the epoxy's working time and avoid exothermic reactions.16:16
Altro da RAN Sailing
Da RAN Sailing — guarda la barca, l'equipaggio e ogni video analizzato del canale.
The Sailing Directory Newsletter
Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.



