RAN Sailingvídeo

Keel Recess Work Begins! Building Our 50ft Dreamboat - Ep. 369

27 de outubro de 2023 · 19 min · 117K visualizações · Skåne

O que este vídeo aborda

To prepare for laminating the hull of a 50-foot boat, the crew constructed a climate-controlled enclosure within a barn using plastic sheeting to create an insulated air gap.1:30 They installed two 9-kilowatt electrical heaters and a diesel heater to maintain stable temperatures, monitoring conditions with sensors for humidity, temperature, and barometric pressure.3:12 To prevent moisture from the ground, they covered the floor with plastic.3:36 The team prepared the keel recess by cutting five layers of 600-gram fiberglass cloth, each with rounded corners to improve structural integrity.14:10 They also cut vacuum-bagging materials and added unidirectional 1200-gram fiberglass reinforcement for the chain plate areas.11:21 Before the main lamination, they applied a primer coat of epoxy to the wood to prevent off-gassing and ensure the wood does not wick resin away from the fiberglass, which could result in a starved joint.14:54 The crew plans to apply the fiberglass in smaller sections to manage the epoxy's working time and avoid exothermic reactions.16:16

Ver no YouTube

Mais de RAN Sailing

There's No Manual For This! Building Our Own 52ft Sailboat - Ep. 506 Ran Sailing10/2026Carbon Pillars & No Dorade Boxes! - Building Our 52ft Sailboat - Ep. 505 Ran Sailing10/2026Will the Sanding EVER End? Building Our Dreamboat - Ep. 503 Ran Sailing09/2026Something's Not Right Here! Building Our 52ft Sailboat - Ep. 50209/2026

De RAN Sailing — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema