RAN Sailingvidéo

Keel Recess Work Begins! Building Our 50ft Dreamboat - Ep. 369

27 octobre 2023 · 19 min · 117K vues · Skåne

Ce que couvre cette vidéo

To prepare for laminating the hull of a 50-foot boat, the crew constructed a climate-controlled enclosure within a barn using plastic sheeting to create an insulated air gap.1:30 They installed two 9-kilowatt electrical heaters and a diesel heater to maintain stable temperatures, monitoring conditions with sensors for humidity, temperature, and barometric pressure.3:12 To prevent moisture from the ground, they covered the floor with plastic.3:36 The team prepared the keel recess by cutting five layers of 600-gram fiberglass cloth, each with rounded corners to improve structural integrity.14:10 They also cut vacuum-bagging materials and added unidirectional 1200-gram fiberglass reinforcement for the chain plate areas.11:21 Before the main lamination, they applied a primer coat of epoxy to the wood to prevent off-gassing and ensure the wood does not wick resin away from the fiberglass, which could result in a starved joint.14:54 The crew plans to apply the fiberglass in smaller sections to manage the epoxy's working time and avoid exothermic reactions.16:16

Regarder sur YouTube

Plus de vidéos de RAN Sailing

There's No Manual For This! Building Our Own 52ft Sailboat - Ep. 506 Ran Sailingoct. 2026Carbon Pillars & No Dorade Boxes! - Building Our 52ft Sailboat - Ep. 505 Ran Sailingoct. 2026Will the Sanding EVER End? Building Our Dreamboat - Ep. 503 Ran Sailingsept. 2026Something's Not Right Here! Building Our 52ft Sailboat - Ep. 502sept. 2026

De RAN Sailing — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème