Sailing Blue Pearlvideo

Ep 61 | One project after another

12 novembre 2023 · 16 min · 1K visualizzazioni

Cosa tratta questo video

Chris Hanna and Jessica Hanna perform multiple maintenance tasks on Blue Pearl while docked at a marina. Chris uses a Harken bosun’s chair to climb the mizzenmast and remove a damaged radar reflector that was banging against the mast.0:55 The crew also addresses a steering failure caused by mismatched American and metric threads on the quadrant’s stainless steel eye bolts, which allowed the cables to slip off the pulleys.12:02 Chris replaces the failed nuts with galvanized hardware as a temporary fix until stainless steel replacements can be sourced.12:43 Additionally, the crew prepares for forecasted 35-knot winds by deploying two 75-pound CQR anchors off the bow to keep the boat from rubbing against the dock.16:02 Jessica also installs a Ninja toaster oven to reduce reliance on propane for cooking.7:05

Guarda su YouTube

Altro da Sailing Blue Pearl

Our Precious Daisy Mae💔giu 2026Ep 100 | The Grand Finalegiu 2025Ep 81 | A HUGE upgrade for Blue Pearl!ago 2024Ep 56 | One last adventure before we dock the boat!ago 2023

Da Sailing Blue Pearl — guarda la barca, l'equipaggio e ogni video analizzato del canale.

The Sailing Directory Newsletter

Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.

Segnala un problema