Sailing Blue Pearlvídeo

Ep 61 | One project after another

12 de novembro de 2023 · 16 min · 1K visualizações

O que este vídeo aborda

Chris Hanna and Jessica Hanna perform multiple maintenance tasks on Blue Pearl while docked at a marina. Chris uses a Harken bosun’s chair to climb the mizzenmast and remove a damaged radar reflector that was banging against the mast.0:55 The crew also addresses a steering failure caused by mismatched American and metric threads on the quadrant’s stainless steel eye bolts, which allowed the cables to slip off the pulleys.12:02 Chris replaces the failed nuts with galvanized hardware as a temporary fix until stainless steel replacements can be sourced.12:43 Additionally, the crew prepares for forecasted 35-knot winds by deploying two 75-pound CQR anchors off the bow to keep the boat from rubbing against the dock.16:02 Jessica also installs a Ninja toaster oven to reduce reliance on propane for cooking.7:05

Ver no YouTube

Mais de Sailing Blue Pearl

Our Precious Daisy Mae💔06/2026Ep 100 | The Grand Finale06/2025Ep 81 | A HUGE upgrade for Blue Pearl!08/2024Ep 56 | One last adventure before we dock the boat!08/2023

De Sailing Blue Pearl — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema