Sailing Blue Pearlvídeo
Ep 61 | One project after another
12 de novembro de 2023 · 16 min · 1K visualizações
O que este vídeo aborda
Chris Hanna and Jessica Hanna perform multiple maintenance tasks on Blue Pearl while docked at a marina. Chris uses a Harken bosun’s chair to climb the mizzenmast and remove a damaged radar reflector that was banging against the mast.0:55 The crew also addresses a steering failure caused by mismatched American and metric threads on the quadrant’s stainless steel eye bolts, which allowed the cables to slip off the pulleys.12:02 Chris replaces the failed nuts with galvanized hardware as a temporary fix until stainless steel replacements can be sourced.12:43 Additionally, the crew prepares for forecasted 35-knot winds by deploying two 75-pound CQR anchors off the bow to keep the boat from rubbing against the dock.16:02 Jessica also installs a Ninja toaster oven to reduce reliance on propane for cooking.7:05
Mais de Sailing Blue Pearl
De Sailing Blue Pearl — veja o barco, a tripulação e cada vídeo analisado do canal.
The Sailing Directory Newsletter
Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.



