Wildling Sailingvideo

This Ocean-Going Catamaran Project Is Coming Together!

31. mai 2024 · 22 min · 112K visninger

Hva denne videoen dekker

Refit work on the catamaran focuses on structural repairs and engine maintenance. The host installs mast step wedges using a structural filleting blend, aiming for a 3-to-4-degree mast angle to optimize sail performance.0:57 During the process, he discovers fungus-related rot in an interior insulation panel and an adjacent bulkhead near a mast-supporting beam.4:11 He plans to cut out the affected section and replace it with 12mm plywood.7:44 Separately, the host and his father disassemble the engine leg to replace two oil seals after finding water in the oil.12:58 They discover the prop shaft also requires two additional seals, necessitating a trip to a local supplier.14:41 The host also prepares running rigging using Dyneema, reinforced thimbles, and various shackles.9:18 Meanwhile, the crew cleans and sands the cabin interior in preparation for painting.15:54 The engine leg remains disassembled pending the acquisition of the correct replacement seals, while the aft beam installation awaits minor adjustments to fit the sanded mounting block.17:36

Se på YouTube

Mer fra Wildling Sailing

One Step Back, One Step Sideways & One Step Forward | My Budget Catamaran Refitokt. 2026I Lifted Her Out For a Very Important Rebuild.sep. 2026One Final Refit Before Crossing The Atlantic.aug. 20262 Days Alone at Sea On my Primitive Double-Canoe.aug. 2026

Fra Wildling Sailing – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem