Wildling Sailingvideo

This Ocean-Going Catamaran Project Is Coming Together!

May 31, 2024 · 22 min · 112K views

What this video covers

Refit work on the catamaran focuses on structural repairs and engine maintenance. The host installs mast step wedges using a structural filleting blend, aiming for a 3-to-4-degree mast angle to optimize sail performance.0:57 During the process, he discovers fungus-related rot in an interior insulation panel and an adjacent bulkhead near a mast-supporting beam.4:11 He plans to cut out the affected section and replace it with 12mm plywood.7:44 Separately, the host and his father disassemble the engine leg to replace two oil seals after finding water in the oil.12:58 They discover the prop shaft also requires two additional seals, necessitating a trip to a local supplier.14:41 The host also prepares running rigging using Dyneema, reinforced thimbles, and various shackles.9:18 Meanwhile, the crew cleans and sands the cabin interior in preparation for painting.15:54 The engine leg remains disassembled pending the acquisition of the correct replacement seals, while the aft beam installation awaits minor adjustments to fit the sanded mounting block.17:36

Watch on YouTube

More from Wildling Sailing

One Step Back, One Step Sideways & One Step Forward | My Budget Catamaran RefitOct 2026I Lifted Her Out For a Very Important Rebuild.Sep 2026One Final Refit Before Crossing The Atlantic.Aug 20262 Days Alone at Sea On my Primitive Double-Canoe.Aug 2026

From Wildling Sailing — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue