Wildling Sailingvídeo

This Ocean-Going Catamaran Project Is Coming Together!

31 de mayo de 2024 · 22 min · 112K visitas

Qué cubre este vídeo

Refit work on the catamaran focuses on structural repairs and engine maintenance. The host installs mast step wedges using a structural filleting blend, aiming for a 3-to-4-degree mast angle to optimize sail performance.0:57 During the process, he discovers fungus-related rot in an interior insulation panel and an adjacent bulkhead near a mast-supporting beam.4:11 He plans to cut out the affected section and replace it with 12mm plywood.7:44 Separately, the host and his father disassemble the engine leg to replace two oil seals after finding water in the oil.12:58 They discover the prop shaft also requires two additional seals, necessitating a trip to a local supplier.14:41 The host also prepares running rigging using Dyneema, reinforced thimbles, and various shackles.9:18 Meanwhile, the crew cleans and sands the cabin interior in preparation for painting.15:54 The engine leg remains disassembled pending the acquisition of the correct replacement seals, while the aft beam installation awaits minor adjustments to fit the sanded mounting block.17:36

Ver en YouTube

Más de Wildling Sailing

One Step Back, One Step Sideways & One Step Forward | My Budget Catamaran Refitoct 2026I Lifted Her Out For a Very Important Rebuild.sept 2026One Final Refit Before Crossing The Atlantic.ago 20262 Days Alone at Sea On my Primitive Double-Canoe.ago 2026

De Wildling Sailing — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema