Gone with the Wynnsvideo
Boat Build Update: Appliances, Carbon Fiber Rudder & Hardware
10. september 2023 · 24 min · 241K visninger · Xiamen
Hva denne videoen dekker
Construction of a new catamaran at the HH factory in Xiamen, China, nears completion as the build enters its final month.22:03 The project management process involves frequent variation orders (VOs) to finalize specifications, including the addition of a dishwasher and custom window shades secured by suction cups.18:35 On-site inspections reveal the installation of carbon fiber rudders, winglet-equipped keels, and Lewmar 55 Evo electric winches.14:32 The electrical system is currently being wired, and the vessel is being fitted with a programmable R290-refrigerant fridge-freezer unit designed for energy efficiency and flexible storage.12:45 The owners coordinate with their project manager, Molly, to track these modifications and manage logistics via the Taobao app.6:27 Despite the appearance of industrial chaos during the final assembly phase, the factory maintains a high level of detail, including hand-sanding interior locker surfaces.15:24 The build process requires rigorous documentation of all design changes to ensure accuracy before final delivery.21:35
Båter i denne videoen
Mer fra Gone with the Wynns
Fra Gone with the Wynns – se kanalens båt, mannskap og alle analyserte videoer.
The Sailing Directory Newsletter
Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.



