Gone with the Wynnsvideo

Boat Build Update: Appliances, Carbon Fiber Rudder & Hardware

10. september 2023 · 24 min · 241K visninger · Xiamen

Hva denne videoen dekker

Construction of a new catamaran at the HH factory in Xiamen, China, nears completion as the build enters its final month.22:03 The project management process involves frequent variation orders (VOs) to finalize specifications, including the addition of a dishwasher and custom window shades secured by suction cups.18:35 On-site inspections reveal the installation of carbon fiber rudders, winglet-equipped keels, and Lewmar 55 Evo electric winches.14:32 The electrical system is currently being wired, and the vessel is being fitted with a programmable R290-refrigerant fridge-freezer unit designed for energy efficiency and flexible storage.12:45 The owners coordinate with their project manager, Molly, to track these modifications and manage logistics via the Taobao app.6:27 Despite the appearance of industrial chaos during the final assembly phase, the factory maintains a high level of detail, including hand-sanding interior locker surfaces.15:24 The build process requires rigorous documentation of all design changes to ensure accuracy before final delivery.21:35

Se på YouTube

Båter i denne videoen

Hh 44Omvisning

Mer fra Gone with the Wynns

This Cost a Fortune... We Removed It Anywayjuni 2026We Thought We'd Never See These Againmai 2026600 Miles Across the Most Feared Ocean on Earthmai 2026Ice Camping Overnight on Antarcticamai 2026

Fra Gone with the Wynns – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem