Gone with the Wynnsvideo
Boat Build Update: Appliances, Carbon Fiber Rudder & Hardware
10 September 2023 · 24 min · 241K views · Xiamen
What this video covers
Construction of a new catamaran at the HH factory in Xiamen, China, nears completion as the build enters its final month.22:03 The project management process involves frequent variation orders (VOs) to finalize specifications, including the addition of a dishwasher and custom window shades secured by suction cups.18:35 On-site inspections reveal the installation of carbon fiber rudders, winglet-equipped keels, and Lewmar 55 Evo electric winches.14:32 The electrical system is currently being wired, and the vessel is being fitted with a programmable R290-refrigerant fridge-freezer unit designed for energy efficiency and flexible storage.12:45 The owners coordinate with their project manager, Molly, to track these modifications and manage logistics via the Taobao app.6:27 Despite the appearance of industrial chaos during the final assembly phase, the factory maintains a high level of detail, including hand-sanding interior locker surfaces.15:24 The build process requires rigorous documentation of all design changes to ensure accuracy before final delivery.21:35
Boats in this video
More from Gone with the Wynns
From Gone with the Wynns — see the channel’s boat, crew, and every analysed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



