Gone with the Wynnsvidéo

Boat Build Update: Appliances, Carbon Fiber Rudder & Hardware

10 septembre 2023 · 24 min · 241K vues · Xiamen

Ce que couvre cette vidéo

Construction of a new catamaran at the HH factory in Xiamen, China, nears completion as the build enters its final month.22:03 The project management process involves frequent variation orders (VOs) to finalize specifications, including the addition of a dishwasher and custom window shades secured by suction cups.18:35 On-site inspections reveal the installation of carbon fiber rudders, winglet-equipped keels, and Lewmar 55 Evo electric winches.14:32 The electrical system is currently being wired, and the vessel is being fitted with a programmable R290-refrigerant fridge-freezer unit designed for energy efficiency and flexible storage.12:45 The owners coordinate with their project manager, Molly, to track these modifications and manage logistics via the Taobao app.6:27 Despite the appearance of industrial chaos during the final assembly phase, the factory maintains a high level of detail, including hand-sanding interior locker surfaces.15:24 The build process requires rigorous documentation of all design changes to ensure accuracy before final delivery.21:35

Regarder sur YouTube

Bateaux dans cette vidéo

Hh 44Visité

Plus de vidéos de Gone with the Wynns

This Cost a Fortune... We Removed It Anywayjuin 2026We Thought We'd Never See These Againmai 2026600 Miles Across the Most Feared Ocean on Earthmai 2026Ice Camping Overnight on Antarcticamai 2026

De Gone with the Wynns — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème