Sailing Yabávideo

Much needed change in the ENGINE ROOM of this rescued sailboat — Sailing Yabá 244

13. desember 2024 · 16 min · 40K visninger

Hva denne videoen dekker

The crew of Yabá installs a protective cover over the engine room’s exposed, spinning prop shaft to prevent accidental contact during routine inspections.5:51 The project involves constructing a wooden frame topped with a 12-millimeter polycarbonate sheet, which allows for visual monitoring of the shaft’s rotation without opening the hatch.3:37 The builder secures the structure to the engine room platform using eight lug screws and applies Loctite to the fasteners to prevent loosening from engine vibrations.10:12 Additionally, the crew completes a cosmetic renovation of the boat's bathroom, which includes painting geometric patterns and installing a mirror.12:37 The engine room modification provides a necessary safety barrier for checking the engine, Racor fuel filters, and coolant flow while the vessel is underway.11:17

Se på YouTube

Mer fra Sailing Yabá

Everything Has to be Perfect: Preparing the Rig for Brand New Sails — Sailing Yabásep. 2026Our Sails Ripped on Their Last Journey Before a Massive Upgrade! — Sailing Yabásep. 2026Flying Across the Caribbean for Yabá’s Biggest Upgrade Yet — Sailing Yabásep. 2026Sailing to Rio: Exploring Brazil’s Most Famous City — Sailing Yabáaug. 2026

Fra Sailing Yabá – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem