Sailing Yabávídeo

Much needed change in the ENGINE ROOM of this rescued sailboat — Sailing Yabá 244

13 de dezembro de 2024 · 16 min · 40K visualizações

O que este vídeo aborda

The crew of Yabá installs a protective cover over the engine room’s exposed, spinning prop shaft to prevent accidental contact during routine inspections.5:51 The project involves constructing a wooden frame topped with a 12-millimeter polycarbonate sheet, which allows for visual monitoring of the shaft’s rotation without opening the hatch.3:37 The builder secures the structure to the engine room platform using eight lug screws and applies Loctite to the fasteners to prevent loosening from engine vibrations.10:12 Additionally, the crew completes a cosmetic renovation of the boat's bathroom, which includes painting geometric patterns and installing a mirror.12:37 The engine room modification provides a necessary safety barrier for checking the engine, Racor fuel filters, and coolant flow while the vessel is underway.11:17

Ver no YouTube

Mais de Sailing Yabá

Everything Has to be Perfect: Preparing the Rig for Brand New Sails — Sailing Yabá09/2026Our Sails Ripped on Their Last Journey Before a Massive Upgrade! — Sailing Yabá09/2026Flying Across the Caribbean for Yabá’s Biggest Upgrade Yet — Sailing Yabá09/2026Sailing to Rio: Exploring Brazil’s Most Famous City — Sailing Yabá08/2026

De Sailing Yabá — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema