Sailing Yabávideo

Much needed change in the ENGINE ROOM of this rescued sailboat — Sailing Yabá 244

13 December 2024 · 16 min · 40K views

What this video covers

The crew of Yabá installs a protective cover over the engine room’s exposed, spinning prop shaft to prevent accidental contact during routine inspections.5:51 The project involves constructing a wooden frame topped with a 12-millimeter polycarbonate sheet, which allows for visual monitoring of the shaft’s rotation without opening the hatch.3:37 The builder secures the structure to the engine room platform using eight lug screws and applies Loctite to the fasteners to prevent loosening from engine vibrations.10:12 Additionally, the crew completes a cosmetic renovation of the boat's bathroom, which includes painting geometric patterns and installing a mirror.12:37 The engine room modification provides a necessary safety barrier for checking the engine, Racor fuel filters, and coolant flow while the vessel is underway.11:17

Watch on YouTube

More from Sailing Yabá

Everything Has to be Perfect: Preparing the Rig for Brand New Sails — Sailing YabáSept 2026Our Sails Ripped on Their Last Journey Before a Massive Upgrade! — Sailing YabáSept 2026Flying Across the Caribbean for Yabá’s Biggest Upgrade Yet — Sailing YabáSept 2026Sailing to Rio: Exploring Brazil’s Most Famous City — Sailing YabáAug 2026

From Sailing Yabá — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue