Sailing Yabávídeo
Much needed change in the ENGINE ROOM of this rescued sailboat — Sailing Yabá 244
13 de diciembre de 2024 · 16 min · 40K visitas
Qué cubre este vídeo
The crew of Yabá installs a protective cover over the engine room’s exposed, spinning prop shaft to prevent accidental contact during routine inspections.5:51 The project involves constructing a wooden frame topped with a 12-millimeter polycarbonate sheet, which allows for visual monitoring of the shaft’s rotation without opening the hatch.3:37 The builder secures the structure to the engine room platform using eight lug screws and applies Loctite to the fasteners to prevent loosening from engine vibrations.10:12 Additionally, the crew completes a cosmetic renovation of the boat's bathroom, which includes painting geometric patterns and installing a mirror.12:37 The engine room modification provides a necessary safety barrier for checking the engine, Racor fuel filters, and coolant flow while the vessel is underway.11:17
Más de Sailing Yabá
De Sailing Yabá — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



