Project Brupegvideo
Who knew building a friggen wall could take so long! - Project Brupeg Ep.415
19. august 2025 · 23 min · 17K visninger
Hva denne videoen dekker
The crew of the 10-year rebuild project *Brupeg*, a former fishing trawler, completes the interior fit-out of a forward cabin by installing plywood wall panels, insulation, and structural framing. To prevent condensation and mold, the team installs standoff panels to create an air gap between the hull and the interior walls, sealing the assembly with epoxy.▶ 4:25 They use 4mm plywood for the bulkheads, cutting 45-degree angles at joints to minimize gaps before applying fairing compound to create a smooth, sealed surface.▶ 2:37 For insulation, the crew replaces polystyrene with flexible fiberglass batting, which proves faster to install and allows for a double-layer application.▶ 15:22 The cabin ventilation system utilizes four redundant computer fans, a configuration the crew reports has remained reliable for nine years.▶ 20:38 After filling the vessel’s 5,300-liter potable water tank and completing the cabin walls, the crew prepares to depart for Magnetic Island to continue the build.▶ 22:11
Mer fra Project Brupeg
Fra Project Brupeg – se kanalens båt, mannskap og alle analyserte videoer.
The Sailing Directory Newsletter
Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.



