Project Brupegvidéo
Who knew building a friggen wall could take so long! - Project Brupeg Ep.415
19 août 2025 · 23 min · 17K vues
Ce que couvre cette vidéo
The crew of the 10-year rebuild project *Brupeg*, a former fishing trawler, completes the interior fit-out of a forward cabin by installing plywood wall panels, insulation, and structural framing. To prevent condensation and mold, the team installs standoff panels to create an air gap between the hull and the interior walls, sealing the assembly with epoxy.▶ 4:25 They use 4mm plywood for the bulkheads, cutting 45-degree angles at joints to minimize gaps before applying fairing compound to create a smooth, sealed surface.▶ 2:37 For insulation, the crew replaces polystyrene with flexible fiberglass batting, which proves faster to install and allows for a double-layer application.▶ 15:22 The cabin ventilation system utilizes four redundant computer fans, a configuration the crew reports has remained reliable for nine years.▶ 20:38 After filling the vessel’s 5,300-liter potable water tank and completing the cabin walls, the crew prepares to depart for Magnetic Island to continue the build.▶ 22:11
Plus de vidéos de Project Brupeg
De Project Brupeg — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



