Project Brupegvideo

Who knew building a frigging wall could take so long! - Project Brupeg Ep.415

19 August 2025 · 23 min · 17K views

What this video covers

The crew of the 10-year rebuild project Brupeg, a former fishing trawler, completes the interior fit-out of a forward cabin by installing plywood wall panels, insulation, and structural framing. To prevent condensation and mould, the team installs standoff panels to create an air gap between the hull and the interior walls, sealing the assembly with epoxy.4:25 They use 4mm plywood for the bulkheads, cutting 45-degree angles at joints to minimise gaps before applying fairing compound to create a smooth, sealed surface.2:37 For insulation, the crew replaces polystyrene with flexible fibreglass batting, which proves faster to install and allows for a double-layer application.15:22 The cabin ventilation system utilises four redundant computer fans, a configuration the crew reports has remained reliable for nine years.20:38 After filling the vessel’s 5,300-litre potable water tank and completing the cabin walls, the crew prepares to depart for Magnetic Island to continue the build.22:11

Watch on YouTube

More from Project Brupeg

What caused the steering to fail - Project Brupeg Ep.463Oct 2026CHAOS! & our first Night Time Trailer Haul Out - Project Brupeg Ep.462Sept 2026Look, It's possible we should have cleaned this before now... Project Brupeg Ep.461Sept 2026The Ridiculously Powerful Davit Winch - Project Brupeg Ep.460Sept 2026

From Project Brupeg — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue