Sailing Catalpavideo

Storage on our Sail Boat home & learning how to WELD Ep 396

25. februar 2024 · 20 min · 10K visninger

Hva denne videoen dekker

Lee performs several maintenance tasks on the 46-foot boat Catalpa, focusing on plumbing, electrical, and metal fabrication. He re-plumbs the forward head discharge line to eliminate a dip that caused blockages, ensuring a consistent flow to the seacock.1:36 He replaces plastic fittings on the sea chest with bronze alternatives and installs a new bronze intake system to replace a corroded stainless steel setup.13:44 To accommodate the new sea chest height, Lee fabricates a custom mounting bracket, using an Eastwood welder to join the metal components.9:16 He also cleans up loose, salt-exposed wiring in the engine bay and installs a dedicated battery box for a Dakota Lithium battery.12:11 Finally, Lee repairs a boom cover control line by performing a splice to create a continuous loop, allowing the cover to operate as designed.18:22 These repairs aim to improve system reliability and organization in preparation for future sailing.

Se på YouTube

Mer fra Sailing Catalpa

they weren't expecting thissep. 2026one of the most remote islands on the planetsep. 202629 days sailing Panama to French Polynesia the whole passageaug. 2026what did we learn from a month at seaaug. 2026

Fra Sailing Catalpa – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem