Sailing Catalpavideo

Storage on our Sail Boat home & learning how to WELD Ep 396

25 February 2024 · 20 min · 10K views

What this video covers

Lee performs several maintenance tasks on the 46-foot boat Catalpa, focusing on plumbing, electrical, and metal fabrication. He re-plumbs the forward head discharge line to eliminate a dip that caused blockages, ensuring a consistent flow to the seacock.1:36 He replaces plastic fittings on the sea chest with bronze alternatives and installs a new bronze intake system to replace a corroded stainless steel setup.13:44 To accommodate the new sea chest height, Lee fabricates a custom mounting bracket, using an Eastwood welder to join the metal components.9:16 He also cleans up loose, salt-exposed wiring in the engine bay and installs a dedicated battery box for a Dakota Lithium battery.12:11 Finally, Lee repairs a boom cover control line by performing a splice to create a continuous loop, allowing the cover to operate as designed.18:22 These repairs aim to improve system reliability and organization in preparation for future sailing.

Watch on YouTube

More from Sailing Catalpa

arriving to the most remote atolls on earth...the TuamotusSept 2026they weren't expecting thisSept 2026one of the most remote islands on the planetSept 202629 days sailing Panama to French Polynesia the whole passageAug 2026

From Sailing Catalpa — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue