Sailing Catalpavídeo

Storage on our Sail Boat home & learning how to WELD Ep 396

25 de fevereiro de 2024 · 20 min · 10K visualizações

O que este vídeo aborda

Lee performs several maintenance tasks on the 46-foot boat Catalpa, focusing on plumbing, electrical, and metal fabrication. He re-plumbs the forward head discharge line to eliminate a dip that caused blockages, ensuring a consistent flow to the seacock.1:36 He replaces plastic fittings on the sea chest with bronze alternatives and installs a new bronze intake system to replace a corroded stainless steel setup.13:44 To accommodate the new sea chest height, Lee fabricates a custom mounting bracket, using an Eastwood welder to join the metal components.9:16 He also cleans up loose, salt-exposed wiring in the engine bay and installs a dedicated battery box for a Dakota Lithium battery.12:11 Finally, Lee repairs a boom cover control line by performing a splice to create a continuous loop, allowing the cover to operate as designed.18:22 These repairs aim to improve system reliability and organization in preparation for future sailing.

Assistir no YouTube

Mais de Sailing Catalpa

they weren't expecting thisset. de 2026one of the most remote islands on the planetset. de 202629 days sailing Panama to French Polynesia the whole passageago. de 2026what did we learn from a month at seaago. de 2026

De Sailing Catalpa — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema