Sailing Catalpavidéo
Storage on our Sail Boat home & learning how to WELD Ep 396
25 février 2024 · 20 min · 10K vues
Ce que couvre cette vidéo
Lee performs several maintenance tasks on the 46-foot boat Catalpa, focusing on plumbing, electrical, and metal fabrication. He re-plumbs the forward head discharge line to eliminate a dip that caused blockages, ensuring a consistent flow to the seacock.1:36 He replaces plastic fittings on the sea chest with bronze alternatives and installs a new bronze intake system to replace a corroded stainless steel setup.13:44 To accommodate the new sea chest height, Lee fabricates a custom mounting bracket, using an Eastwood welder to join the metal components.9:16 He also cleans up loose, salt-exposed wiring in the engine bay and installs a dedicated battery box for a Dakota Lithium battery.12:11 Finally, Lee repairs a boom cover control line by performing a splice to create a continuous loop, allowing the cover to operate as designed.18:22 These repairs aim to improve system reliability and organization in preparation for future sailing.
Plus de vidéos de Sailing Catalpa
De Sailing Catalpa — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



