Acorn To Arabellavideo

Acorn to Arabella - Journey of a Wooden Boat - Episode 15: Casting The Ballast Keel Mold

1. september 2017 · 13 min · 108K visninger

Hva denne videoen dekker

Steve and the crew construct a concrete mold to cast a 10,000-pound lead ballast keel for a wooden sailboat.0:20 Because smelting iron is cost-prohibitive and requires specialized equipment, the team opts for a lead keel they can pour on-site.0:37 They build a reinforced box using double-ply plywood, angle iron, and strapping to withstand the pressure of the concrete and molten lead.4:07 To prevent moisture-related explosions during the pour, they prepare a level surface with a plastic moisture barrier and plan to use a flame weeder to dry the concrete thoroughly before introducing the lead.3:43 The process involves creating a plug, pouring concrete around it, and removing the plug to leave a cavity.8:09 The team intends to insert wooden cores into the mold to create pilot holes for the keel bolts.11:02 They plan to cover the mold with plywood and weights during the pour as a safety measure against potential steam-driven eruptions.12:09

Se på YouTube

Mer fra Acorn To Arabella

We Stripped Our Wooden Sailboat Back to Bare Wood... Againokt. 2026Saying Goodbye to Newfoundland—and the Man Who Inspired Arabellasep. 2026Upgrading the Rudder and Another Trek To The Cliffaug. 2026We're Climbing a Wall No One Has Ever Climbed Before | Rock Climbing on Newfoundland's South Coastjuli 2026

Fra Acorn To Arabella – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem