Acorn To Arabellavideo

Acorn to Arabella - Journey of a Wooden Boat - Episode 15: Casting The Ballast Keel Mold

September 1, 2017 · 13 min · 108K views

What this video covers

Steve and the crew construct a concrete mold to cast a 10,000-pound lead ballast keel for a wooden sailboat.0:20 Because smelting iron is cost-prohibitive and requires specialized equipment, the team opts for a lead keel they can pour on-site.0:37 They build a reinforced box using double-ply plywood, angle iron, and strapping to withstand the pressure of the concrete and molten lead.4:07 To prevent moisture-related explosions during the pour, they prepare a level surface with a plastic moisture barrier and plan to use a flame weeder to dry the concrete thoroughly before introducing the lead.3:43 The process involves creating a plug, pouring concrete around it, and removing the plug to leave a cavity.8:09 The team intends to insert wooden cores into the mold to create pilot holes for the keel bolts.11:02 They plan to cover the mold with plywood and weights during the pour as a safety measure against potential steam-driven eruptions.12:09

Watch on YouTube

More from Acorn To Arabella

We Stripped Our Wooden Sailboat Back to Bare Wood... AgainOct 2026Saying Goodbye to Newfoundland—and the Man Who Inspired ArabellaSep 2026Upgrading the Rudder and Another Trek To The CliffAug 2026We're Climbing a Wall No One Has Ever Climbed Before | Rock Climbing on Newfoundland's South CoastJul 2026

From Acorn To Arabella — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue