Acorn To Arabellavidéo

Acorn to Arabella - Journey of a Wooden Boat - Episode 15: Casting The Ballast Keel Mold

1 septembre 2017 · 13 min · 108K vues

Ce que couvre cette vidéo

Steve and the crew construct a concrete mold to cast a 10,000-pound lead ballast keel for a wooden sailboat.0:20 Because smelting iron is cost-prohibitive and requires specialized equipment, the team opts for a lead keel they can pour on-site.0:37 They build a reinforced box using double-ply plywood, angle iron, and strapping to withstand the pressure of the concrete and molten lead.4:07 To prevent moisture-related explosions during the pour, they prepare a level surface with a plastic moisture barrier and plan to use a flame weeder to dry the concrete thoroughly before introducing the lead.3:43 The process involves creating a plug, pouring concrete around it, and removing the plug to leave a cavity.8:09 The team intends to insert wooden cores into the mold to create pilot holes for the keel bolts.11:02 They plan to cover the mold with plywood and weights during the pour as a safety measure against potential steam-driven eruptions.12:09

Regarder sur YouTube

Plus de vidéos de Acorn To Arabella

We Stripped Our Wooden Sailboat Back to Bare Wood... Againoct. 2026Saying Goodbye to Newfoundland—and the Man Who Inspired Arabellasept. 2026Upgrading the Rudder and Another Trek To The Cliffaoût 2026We're Climbing a Wall No One Has Ever Climbed Before | Rock Climbing on Newfoundland's South Coastjuil. 2026

De Acorn To Arabella — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème