Acorn To Arabellavídeo
Acorn to Arabella - Journey of a Wooden Boat - Episode 15: Casting The Ballast Keel Mold
1 de setembro de 2017 · 13 min · 108K visualizações
O que este vídeo aborda
Steve and the crew construct a concrete mold to cast a 10,000-pound lead ballast keel for a wooden sailboat.0:20 Because smelting iron is cost-prohibitive and requires specialized equipment, the team opts for a lead keel they can pour on-site.0:37 They build a reinforced box using double-ply plywood, angle iron, and strapping to withstand the pressure of the concrete and molten lead.4:07 To prevent moisture-related explosions during the pour, they prepare a level surface with a plastic moisture barrier and plan to use a flame weeder to dry the concrete thoroughly before introducing the lead.3:43 The process involves creating a plug, pouring concrete around it, and removing the plug to leave a cavity.8:09 The team intends to insert wooden cores into the mold to create pilot holes for the keel bolts.11:02 They plan to cover the mold with plywood and weights during the pour as a safety measure against potential steam-driven eruptions.12:09
Mais de Acorn To Arabella
De Acorn To Arabella — veja o barco, a tripulação e cada vídeo analisado do canal.
The Sailing Directory Newsletter
Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.



