Land Rats on a Bartered Sailboatvideo

Installing most of the furniture on our Sailboat | Land Rats | EP 3

9. august 2020 · 9 min · 440 visninger

Hva denne videoen dekker

The interior refit of the sailboat involves reinstalling cabin furniture after structural modifications to the roof. Lifting the roof created a gap that required custom filler pieces to close.1:06 During the floor installation, the crew identified wasted space beneath the floorboards and modified the panels to create removable hatches for additional storage.1:39 The chart table installation proved difficult due to the sequence of assembly and existing damage to the unit, which remains partially unrepaired.3:04 The crew also cut a bench in half to facilitate installation before rejoining the sections.4:11 A stubborn screw hindered the final assembly process, requiring manual extraction.6:26 Proper sequencing of furniture installation prevents access issues and simplifies the fitting of damaged or modified components.

Se på YouTube

Mer fra Land Rats on a Bartered Sailboat

Sailing across country borders, International Sailing, South Africa to Namibia | Land Rats | EP70juli 2022Exploring Richards bay and sailing back to Durban | Land Rats | EP60okt. 2021Offshore Sailing, first passage on our Steel boat, Durban to Richards Bay | Land Rats | EP59okt. 2021Out Sailingsep. 2021

Fra Land Rats on a Bartered Sailboat – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem