Installing most of the furniture on our Sailboat | Land Rats | EP 3
9 de agosto de 2020 · 9 min · 440 visualizações
O que este vídeo aborda
The interior refit of the sailboat involves reinstalling cabin furniture after structural modifications to the roof. Lifting the roof created a gap that required custom filler pieces to close.1:06 During the floor installation, the crew identified wasted space beneath the floorboards and modified the panels to create removable hatches for additional storage.1:39 The chart table installation proved difficult due to the sequence of assembly and existing damage to the unit, which remains partially unrepaired.3:04 The crew also cut a bench in half to facilitate installation before rejoining the sections.4:11 A stubborn screw hindered the final assembly process, requiring manual extraction.6:26 Proper sequencing of furniture installation prevents access issues and simplifies the fitting of damaged or modified components.
Mais de Land Rats on a Bartered Sailboat
De Land Rats on a Bartered Sailboat — veja o barco, a tripulação e todos os vídeos analisados do canal.
The Sailing Directory Newsletter
Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.



