Land Rats on a Bartered Sailboatvidéo

Installing most of the furniture on our Sailboat | Land Rats | EP 3

9 août 2020 · 9 min · 440 vues

Ce que couvre cette vidéo

The interior refit of the sailboat involves reinstalling cabin furniture after structural modifications to the roof. Lifting the roof created a gap that required custom filler pieces to close.1:06 During the floor installation, the crew identified wasted space beneath the floorboards and modified the panels to create removable hatches for additional storage.1:39 The chart table installation proved difficult due to the sequence of assembly and existing damage to the unit, which remains partially unrepaired.3:04 The crew also cut a bench in half to facilitate installation before rejoining the sections.4:11 A stubborn screw hindered the final assembly process, requiring manual extraction.6:26 Proper sequencing of furniture installation prevents access issues and simplifies the fitting of damaged or modified components.

Regarder sur YouTube

Plus de vidéos de Land Rats on a Bartered Sailboat

Sailing across country borders, International Sailing, South Africa to Namibia | Land Rats | EP70juil. 2022Exploring Richards bay and sailing back to Durban | Land Rats | EP60oct. 2021Offshore Sailing, first passage on our Steel boat, Durban to Richards Bay | Land Rats | EP59oct. 2021Out Sailingsept. 2021

De Land Rats on a Bartered Sailboat — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème