Installing most of the furniture on our Sailboat | Land Rats | EP 3
9 de agosto de 2020 · 9 min · 440 visitas
Qué cubre este vídeo
The interior refit of the sailboat involves reinstalling cabin furniture after structural modifications to the roof. Lifting the roof created a gap that required custom filler pieces to close.1:06 During the floor installation, the crew identified wasted space beneath the floorboards and modified the panels to create removable hatches for additional storage.1:39 The chart table installation proved difficult due to the sequence of assembly and existing damage to the unit, which remains partially unrepaired.3:04 The crew also cut a bench in half to facilitate installation before rejoining the sections.4:11 A stubborn screw hindered the final assembly process, requiring manual extraction.6:26 Proper sequencing of furniture installation prevents access issues and simplifies the fitting of damaged or modified components.
Más de Land Rats on a Bartered Sailboat
De Land Rats on a Bartered Sailboat — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



