Sailing Squibvideo

Sailing Squib - May 2026 /4

October 1, 2026 · 19 min · 17 views

What this video covers

Refitting the interior and exterior of the boat Squib involves installing a new water heater, mounting outboard motor brackets, and finishing cabin paneling. The owner installs a new water heater by securing it to the existing bulkhead, requiring only minor drilling and plumbing connections.Watch He fabricates and mounts custom brackets for both a gasoline and an electric outboard motor, ensuring clearance for the shower hose hatch.2:13 Interior work includes installing white panels over previously raw wood surfaces and constructing a custom housing for the wind instrument, which requires shortening the data cable and securing the mounting bracket with perforated metal strapping.5:00 To improve mast rake and backstay tension, the owner fabricates two stainless steel plates for the forestay, drilling 10mm holes using cobalt bits and manual cooling techniques.14:31 Additionally, he discovers the rudder has jumped its lower mounting point while the boat is on the hard, likely due to external impact from construction machinery, and plans to use a car jack and wooden block to realign it.18:36

Watch on YouTube

More from Sailing Squib

Sailing Squib - May 2026/3Sep 2026Sailing Squib May 2026 /2Aug 2026Sailing Squib - Contemporary WitnessJul 2026Sailing Squib - May 2026 /1Jul 2026

From Sailing Squib — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue