Wildling Sailingvideo
A BIG Step Towards Getting My Mast Up!
3. mai 2024 · 24 min · 98K visninger
Hva denne videoen dekker
Refitting a boat for mast installation requires reinforcing the hull and cabin top to support new standing rigging attachment points.0:34 The process involves cutting out sections of foam core, clearing damp plywood, and installing new plywood packing blocks to provide structural backing for chain plates.2:09 Six specific attachment points are prepared: fore and aft intermediate shrouds on both the port and starboard sides, plus two inner forestay bridle points.11:28 Each block is glued into place using epoxy, then sanded and leveled with a lightweight fairing compound to ensure a flat surface for backing plates.14:59 Separately, an outboard motor lower unit requires repeated disassembly to replace leaking drive shaft and shifter seals after water contamination emulsified the gear oil.18:48 The project highlights the time-intensive nature of structural refit work and the mechanical challenges of maintaining older, budget-purchased outboard engines.
Mer fra Wildling Sailing
Fra Wildling Sailing – se kanalens båt, mannskap og alle analyserte videoer.
The Sailing Directory Newsletter
Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.



