Wildling Sailingvideo

A BIG Step Towards Getting My Mast Up!

3 May 2024 · 24 min · 98K views

What this video covers

Refitting a boat for mast installation requires reinforcing the hull and cabin top to support new standing rigging attachment points.0:34 The process involves cutting out sections of foam core, clearing damp plywood, and installing new plywood packing blocks to provide structural backing for chain plates.2:09 Six specific attachment points are prepared: fore and aft intermediate shrouds on both the port and starboard sides, plus two inner forestay bridle points.11:28 Each block is glued into place using epoxy, then sanded and leveled with a lightweight fairing compound to ensure a flat surface for backing plates.14:59 Separately, an outboard motor lower unit requires repeated disassembly to replace leaking drive shaft and shifter seals after water contamination emulsified the gear oil.18:48 The project highlights the time-intensive nature of structural refit work and the mechanical challenges of maintaining older, budget-purchased outboard engines.

Watch on YouTube

More from Wildling Sailing

One Step Back, One Step Sideways & One Step Forward | My Budget Catamaran RefitOct 2026I Lifted Her Out For a Very Important Rebuild.Sept 2026One Final Refit Before Crossing The Atlantic.Aug 20262 Days Alone at Sea On my Primitive Double-Canoe.Aug 2026

From Wildling Sailing — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue