Sailing Yabávideo

Rebuilding a rotten schooner can get very challenging — Sailing Yabá #37

18. juli 2021 · 24 min · 121K visninger

Hva denne videoen dekker

The restoration of the wooden schooner Yabá involves extensive structural repairs to the hull and deck framing. The crew is replacing a section of the rotten Angelique keelson, which showed signs of sapwood decay and worm damage.1:58 Workers are removing damaged pillars, winches, and stoppers to facilitate the installation of new deck beams.6:39 New 10-centimeter-thick timber beams are being cut and fitted to both the port and starboard sides, using a standardized template to maintain consistent curvature.11:42 The team is bolting new beams to existing frames near the engine hatch to create a double-frame structure for added support.19:19 Rainwater infiltration caused significant rot in the original beams and wall sections, necessitating the removal of interior structures to prevent further degradation.23:29 The project is transitioning from the demolition phase to the reconstruction of the deck support system.

Se på YouTube

Mer fra Sailing Yabá

Is a Huge Crew Always Better? (Bittersweet Voyage Surrounded by Whales) — Sailing Yabáokt. 2026Yabá gets Brand New Sails & Set Sail Immediately!— Sailing Yabáokt. 2026Everything Has to be Perfect: Preparing the Rig for Brand New Sails — Sailing Yabásep. 2026Our Sails Ripped on Their Last Journey Before a Massive Upgrade! — Sailing Yabásep. 2026

Fra Sailing Yabá – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem