Sailing Yabávideo

Rebuilding a rotten schooner can get very challenging — Sailing Yabá #37

18 de julio de 2021 · 24 min · 121K vistas

¿Qué cubre este video?

The restoration of the wooden schooner Yabá involves extensive structural repairs to the hull and deck framing. The crew is replacing a section of the rotten Angelique keelson, which showed signs of sapwood decay and worm damage.1:58 Workers are removing damaged pillars, winches, and stoppers to facilitate the installation of new deck beams.6:39 New 10-centimeter-thick timber beams are being cut and fitted to both the port and starboard sides, using a standardized template to maintain consistent curvature.11:42 The team is bolting new beams to existing frames near the engine hatch to create a double-frame structure for added support.19:19 Rainwater infiltration caused significant rot in the original beams and wall sections, necessitating the removal of interior structures to prevent further degradation.23:29 The project is transitioning from the demolition phase to the reconstruction of the deck support system.

Ver en YouTube

Más de Sailing Yabá

Is a Huge Crew Always Better? (Bittersweet Voyage Surrounded by Whales) — Sailing Yabáoct 2026Yabá gets Brand New Sails & Set Sail Immediately!— Sailing Yabáoct 2026Everything Has to be Perfect: Preparing the Rig for Brand New Sails — Sailing Yabásep 2026Our Sails Ripped on Their Last Journey Before a Massive Upgrade! — Sailing Yabásep 2026

De Sailing Yabá — ve el barco, la tripulación y cada video analizado del canal.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.

Reportar un problema