Sailing Yabávideo

Rebuilding a rotten schooner can get very challenging — Sailing Yabá #37

18 July 2021 · 24 min · 121K views

What this video covers

The restoration of the wooden schooner Yabá involves extensive structural repairs to the hull and deck framing. The crew is replacing a section of the rotten Angelique keelson, which showed signs of sapwood decay and worm damage.1:58 Workers are removing damaged pillars, winches, and stoppers to facilitate the installation of new deck beams.6:39 New 10-centimeter-thick timber beams are being cut and fitted to both the port and starboard sides, using a standardized template to maintain consistent curvature.11:42 The team is bolting new beams to existing frames near the engine hatch to create a double-frame structure for added support.19:19 Rainwater infiltration caused significant rot in the original beams and wall sections, necessitating the removal of interior structures to prevent further degradation.23:29 The project is transitioning from the demolition phase to the reconstruction of the deck support system.

Watch on YouTube

More from Sailing Yabá

Sailing to Rio: Exploring Brazil’s Most Famous City — Sailing YabáAug 2026Sailing to Ilha Grande: Prison Island transformed into Tropical Paradise! — Sailing YabáAug 2026This Anchorage Was Worth Every Miserable Mile — Sailing YabáAug 2026Sailing Fully Rigged at Night After Emergency Repairs — Sailing YabáAug 2026

From Sailing Yabá — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue