Sailing Yabávídeo

Rebuilding a rotten schooner can get very challenging — Sailing Yabá #37

18 de julho de 2021 · 24 min · 121K visualizações

O que este vídeo aborda

The restoration of the wooden schooner Yabá involves extensive structural repairs to the hull and deck framing. The crew is replacing a section of the rotten Angelique keelson, which showed signs of sapwood decay and worm damage.1:58 Workers are removing damaged pillars, winches, and stoppers to facilitate the installation of new deck beams.6:39 New 10-centimeter-thick timber beams are being cut and fitted to both the port and starboard sides, using a standardized template to maintain consistent curvature.11:42 The team is bolting new beams to existing frames near the engine hatch to create a double-frame structure for added support.19:19 Rainwater infiltration caused significant rot in the original beams and wall sections, necessitating the removal of interior structures to prevent further degradation.23:29 The project is transitioning from the demolition phase to the reconstruction of the deck support system.

Assistir no YouTube

Mais de Sailing Yabá

Sailing to Rio: Exploring Brazil’s Most Famous City — Sailing Yabáago. de 2026Sailing to Ilha Grande: Prison Island transformed into Tropical Paradise! — Sailing Yabáago. de 2026This Anchorage Was Worth Every Miserable Mile — Sailing Yabáago. de 2026Sailing Fully Rigged at Night After Emergency Repairs — Sailing Yabáago. de 2026

De Sailing Yabá — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema