Sailing Yabávideo
Boat restoration: replacing deck planks with scrapwood — Sailing Yabá 141
9. juli 2023 · 20 min · 119K visninger
Hva denne videoen dekker
The crew of Yabá installs a water pump, alternators, and engine connections to prepare their boat for its first internal engine test.2:06 To simplify future maintenance, they standardize all six engine belts to a single 49-inch size.5:25 Because the original configuration caused belt interference, they fabricate a custom stainless steel bracket to relocate the hoses and clear the pulleys.18:40 They also weld a tensioning system for the water pump, using two nuts and a threaded bar to push the pump against the engine block for precise belt tension.8:42 While working, they use reverse-action quick-grip clamps to hold components in place during installation.6:51 The project also includes fabricating custom deck components from scrap wood, which require varnishing before final installation.0:14 The engine setup now includes functional throttle controls and turbo cooling lines.14:18
Mer fra Sailing Yabá
Fra Sailing Yabá – se kanalens båt, mannskap og alle analyserte videoer.
The Sailing Directory Newsletter
Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.



