Sailing Yabávidéo

Boat restoration: replacing deck planks with scrapwood — Sailing Yabá 141

9 juillet 2023 · 20 min · 119K vues

Ce que couvre cette vidéo

The crew of Yabá installs a water pump, alternators, and engine connections to prepare their boat for its first internal engine test.2:06 To simplify future maintenance, they standardize all six engine belts to a single 49-inch size.5:25 Because the original configuration caused belt interference, they fabricate a custom stainless steel bracket to relocate the hoses and clear the pulleys.18:40 They also weld a tensioning system for the water pump, using two nuts and a threaded bar to push the pump against the engine block for precise belt tension.8:42 While working, they use reverse-action quick-grip clamps to hold components in place during installation.6:51 The project also includes fabricating custom deck components from scrap wood, which require varnishing before final installation.0:14 The engine setup now includes functional throttle controls and turbo cooling lines.14:18

Regarder sur YouTube

Plus de vidéos de Sailing Yabá

Is a Huge Crew Always Better? (Bittersweet Voyage Surrounded by Whales) — Sailing Yabáoct. 2026Yabá gets Brand New Sails & Set Sail Immediately!— Sailing Yabáoct. 2026Everything Has to be Perfect: Preparing the Rig for Brand New Sails — Sailing Yabásept. 2026Our Sails Ripped on Their Last Journey Before a Massive Upgrade! — Sailing Yabásept. 2026

De Sailing Yabá — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème