Sailing Yabávídeo

Boat restoration: replacing deck planks with scrapwood — Sailing Yabá 141

9 de julho de 2023 · 20 min · 119K visualizações

O que este vídeo aborda

The crew of Yabá installs a water pump, alternators, and engine connections to prepare their boat for its first internal engine test.2:06 To simplify future maintenance, they standardize all six engine belts to a single 49-inch size.5:25 Because the original configuration caused belt interference, they fabricate a custom stainless steel bracket to relocate the hoses and clear the pulleys.18:40 They also weld a tensioning system for the water pump, using two nuts and a threaded bar to push the pump against the engine block for precise belt tension.8:42 While working, they use reverse-action quick-grip clamps to hold components in place during installation.6:51 The project also includes fabricating custom deck components from scrap wood, which require varnishing before final installation.0:14 The engine setup now includes functional throttle controls and turbo cooling lines.14:18

Ver no YouTube

Mais de Sailing Yabá

Is a Huge Crew Always Better? (Bittersweet Voyage Surrounded by Whales) — Sailing Yabá10/2026Yabá gets Brand New Sails & Set Sail Immediately!— Sailing Yabá10/2026Everything Has to be Perfect: Preparing the Rig for Brand New Sails — Sailing Yabá09/2026Our Sails Ripped on Their Last Journey Before a Massive Upgrade! — Sailing Yabá09/2026

De Sailing Yabá — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema