Sailing Yabávideo

Boat restoration: replacing deck planks with scrapwood — Sailing Yabá 141

9 de julio de 2023 · 20 min · 119K vistas

¿Qué cubre este video?

The crew of Yabá installs a water pump, alternators, and engine connections to prepare their boat for its first internal engine test.2:06 To simplify future maintenance, they standardize all six engine belts to a single 49-inch size.5:25 Because the original configuration caused belt interference, they fabricate a custom stainless steel bracket to relocate the hoses and clear the pulleys.18:40 They also weld a tensioning system for the water pump, using two nuts and a threaded bar to push the pump against the engine block for precise belt tension.8:42 While working, they use reverse-action quick-grip clamps to hold components in place during installation.6:51 The project also includes fabricating custom deck components from scrap wood, which require varnishing before final installation.0:14 The engine setup now includes functional throttle controls and turbo cooling lines.14:18

Ver en YouTube

Más de Sailing Yabá

Is a Huge Crew Always Better? (Bittersweet Voyage Surrounded by Whales) — Sailing Yabáoct 2026Yabá gets Brand New Sails & Set Sail Immediately!— Sailing Yabáoct 2026Everything Has to be Perfect: Preparing the Rig for Brand New Sails — Sailing Yabásep 2026Our Sails Ripped on Their Last Journey Before a Massive Upgrade! — Sailing Yabásep 2026

De Sailing Yabá — ve el barco, la tripulación y cada video analizado del canal.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.

Reportar un problema