Sven Yrvindvideo
17 Sep 2025 Buumkin, a good start.
16. september 2025 · 4 min · 2K visninger
Hva denne videoen dekker
Sven Yrvind installs a structural component on his small boat, Buumkin, using 154 kilograms of lead weights to test the fit and positioning.0:54 He removes stubborn peel ply from the fiberglass surface using clamps, chisels, and pliers.1:43 After aligning the part, he secures it with thickened epoxy fillets to create a strong bond.2:09 The installation serves as a mounting point for the mast, sheeting, and anchor chain roller.2:34 Yrvind notes that while anchoring from a bowsprit is generally discouraged on larger vessels, the small size and high structural strength of this boat make the configuration viable.2:46 He applies tape to the assembly to prevent epoxy ingress and plans to reinforce the joint with additional glass fiber once the initial cure is complete.3:10 He removes the temporary alignment aids before the epoxy fully sets to ensure the hardware remains functional.3:16
Mer fra Sven Yrvind
Fra Sven Yrvind – se kanalens båt, mannskap og alle analyserte videoer.
The Sailing Directory Newsletter
Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.



