Sven Yrvindvideo
17 Sep 2025 Buumkin, a good start.
September 16, 2025 · 4 min · 2K views
What this video covers
Sven Yrvind installs a structural component on his small boat, Buumkin, using 154 kilograms of lead weights to test the fit and positioning.0:54 He removes stubborn peel ply from the fiberglass surface using clamps, chisels, and pliers.1:43 After aligning the part, he secures it with thickened epoxy fillets to create a strong bond.2:09 The installation serves as a mounting point for the mast, sheeting, and anchor chain roller.2:34 Yrvind notes that while anchoring from a bowsprit is generally discouraged on larger vessels, the small size and high structural strength of this boat make the configuration viable.2:46 He applies tape to the assembly to prevent epoxy ingress and plans to reinforce the joint with additional glass fiber once the initial cure is complete.3:10 He removes the temporary alignment aids before the epoxy fully sets to ensure the hardware remains functional.3:16
More from Sven Yrvind
From Sven Yrvind — see the channel’s boat, crew, and every analyzed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



