Sven Yrvindvideo
Working on the Sheets.
7. august 2026 · 5 min
Hva denne videoen dekker
Sven Yrvind prepares electrical and rigging components for his boat in a workshop. He acquires a digital multimeter to monitor battery voltage, noting the red and black leads for terminal connection.0:42 He also stocks up on fuses and miscellaneous hardware.0:20 Turning to the rigging, he addresses a failure in the sheet attachment system after a component falls from the boom.2:20 He fabricates a new block attachment point using a 50-centimeter length of line secured with knots, routing it through existing holes in the boom structure.3:16 He applies fast-acting glue to the nuts on the interior fittings to ensure they remain secure.4:57 He plans to utilize a cleat intended for the anchor to manage the sheet lines and considers using the same attachment points for the topping lift.2:34
Mer fra Sven Yrvind
Fra Sven Yrvind – se kanalens båt, mannskap og alle analyserte videoer.
The Sailing Directory Newsletter
Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.



