Epiphany Sailingvídeo

Installed a windlass to pull anchor chain Maxwell RC10 on C&C 39 sailboat

21 de agosto de 2024 · 30 min · 909 visualizações

O que este vídeo aborda

Installing a Maxwell RC10 vertical windlass on a C&C 39 sailboat requires cutting multiple deck holes, fabricating a custom aluminum backing plate, and running 2-0 gauge electrical cable from the battery bank to the bow.12:40 The installation process involves using a template to align the windlass assembly and chain drop hole, ensuring the unit clears existing structures within the anchor locker.1:17 Because the boat’s bow configuration creates an elevation difference, a custom roller guide is necessary to align the chain path.4:04 The electrical system requires a 75-amp breaker and a solenoid control box, with foot switches mounted on the deck for operation.16:01 To secure the installation, the crew reinforces the deck with a quarter-inch thick aluminum plate and seals all penetrations with butyl tape and 3M 5200 sealant.10:01 A chain stopper and a D-link anchor point provide fail-safes against windlass load and chain loss.27:58 The project concludes with the installation of a locker divider to separate the 300 feet of stainless steel chain from the secondary anchor rode.28:45

Assistir no YouTube

Barcos neste vídeo

C&C Yachts 39O barco deles

Mais de Epiphany Sailing

YOWZA ITS A THUNDERSTORM SHOWER!!!set. de 2026Bris 12 ft dinghy floor board repairs abr. de 2026Space X Rocket over Georgetown Exumas Bahamas 2/19/2026fev. de 202650 knot Blow Georgetown Exumas saved by Backup Snubber!fev. de 2026

De Epiphany Sailing — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema