Entre Terras e Maresvídeo
FINALLY! WE HAVE STARTED THE FORWARD CABIN S1.ep 157
9 de março de 2025 · 15 min · 520 visualizações
O que este vídeo aborda
Edgar begins the interior refit of the forward cabin, focusing on structural bulkheads and furniture construction.0:11 After clearing the space of stored materials, he marks and cuts plywood for the transverse bulkhead of the forward berth.0:11 The project involves significant layout changes, including replacing a thin bulkhead with thicker material to improve structural integrity and enlarging the bathroom area.6:44 Edgar plans to relocate the holding tank to a rear cabinet to create space for a bench in the head.7:31 He uses 18mm plywood for the berth top and salon table, while managing limited workspace by prioritizing the completion of the berth to clear floor space for remaining materials.8:29 The work includes fabricating cabinet doors and internal navigation tower components.11:06 Despite initial plans to cut all doors first, the workflow shifted to prioritize structural bulkheads and framing.12:32 The project remains ongoing, with adjustments to the cabin layout and storage configuration continuing in real-time.14:22
Mais de Entre Terras e Mares
De Entre Terras e Mares — veja o barco, a tripulação e cada vídeo analisado do canal.
The Sailing Directory Newsletter
Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.



