Entre Terras e Maresvídeo

WE FINISHED the bow cabin LAMINATE ! S1.ep182

28 de junho de 2026 · 21 min · 354 visualizações

O que este vídeo aborda

Edgar and Sâmia completed the laminate interior finishing in the bow cabin of their boat, transitioning from dark surfaces to a lighter aesthetic.4:26 The project involved cutting and bonding laminate sheets to cabin walls, storage doors, and the navigation station.2:30 To maximize interior brightness, the crew used beige laminate for non-visible storage areas and the base of the bed frame.9:33 They applied edge banding to exposed sections and installed hardware, including door handles, USB ports, and lighting fixtures.8:15 The team utilized a flame-retardant, aluminum-backed insulation material called "protelhado" to line the ceiling and provide thermal protection.17:26 Future plans for the cabin include installing a reflective, mirror-like laminate sheet inside a small vanity table and adding three internal shelves to a storage locker.18:00 The cabin renovation remains ongoing, with the floor and ceiling panels still requiring final installation.18:59

Assistir no YouTube

Mais de Entre Terras e Mares

90% of the STRUCTURE is READY S1.ep 183jul. de 2026WE DID IT, WE FINISHED PART OF THE FORMICA IN THE BOW SUITE S1.ep 181jun. de 2026This week the focus was on something elsejun. de 2026WE DID IT! WE FINISHED THE CAPTAIN'S SUITE SINK! S1.ep180mai. de 2026

De Entre Terras e Mares — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema